The waste grab crane serves as the core equipment in the waste feeding systems of modern municipal waste-to-energy plants. Positioned above the waste storage pit, it primarily handles operations such as waste feeding, transportation, mixing, retrieval, and weighing. Our company's waste grab cranes are capable of performing rigorous lifting and conveying tasks, ensuring the smooth operation of waste-to-energy plants. This crane supports manual, semi-automatic, and fully automatic control modes.
| Productivity(t/a) | 450~600 | 600~800 | 800~1000 | 1000~1200 | 1200~1500 | 1600 | |||
| Recommended Nominal Lifting Capacity (t) | 5 | 6.3 | 8 | 10 | 11 | 12.5 | 16 | ||
| Recommended Grab Characteristics |
Volume (m³) | 2~2.5 | 3.2~4.2 | 4.2~5 | 5~6 | 6~6.3 | 6.3~8 | 10~12 | |
| Dead Weight (t) | 2.03~2.21 | 2.91~3.3 | 3.3 | 3.3~4.9 | 4.78~4.9 | 4.78~5.8 | 7.05~9.4 | ||
| Recommended Job Level | A6~A7 | A6~A7 | A7 | A7~A8 A7~A8 | A7~A8 A7~A8 | ||||
| Span | 18 | 22.5 | 22.5 | 22.5 | 28.5 | ||||
| Recommended Speed (m/min) |
Lifting speed | 35 | 40 | 45 | 45 | 45 | 45 | 45 | |
| trolley speed | 40 | 40 | 45 | 45 | 50 | 50 | 50 | ||
| crane speed | 50 | 50 | 50 | 60 | 60 | 65 | 65 | ||
| Total Power | 35.9 | 53.2 | 74 | 105 | 106.5 | 130.5 | 152.5 | ||
| Max wheel load | 90 | 110 | 140 | 160 | 170 | 190 | 226 | ||
| Recommended Power Cable for Overhead Crane Recommended Running Rail Model |
112.6 | 114 | 116 | 116 | 120a | 120a | 120a | ||
| Recommended Running Rail for Overhead Crane Recommended Rail Model |
p24 | p38 | p43 | p43 | p50 | QU80 | QU80 | ||
We are an integrated industrial and trade enterprises. We have our own R&D team, factory and marketing department.
Our Crane can design and manufacture base on FEM, ISO EN, GB standard.
All our processes strictly adhere to ISO-9001 procedures, which include Material Traceability, ISO WPQR and welder certificate, Measuring Device Calibration, NDT for the welding, and full assembling and load testing before delivery.
We accept T/T bank transfer, Paypal.
We suggest you to recruit a crane service team in local to install the crane base on our Installation Guideline and User manual. If cannot, we can send engineer to your factory to guide you do the installation with extra charge, and the transportation, accommodation, translator shall be covered by your side also.